Algorithm of investor’s actions on procedures of connection to power grids (small and medium business – up to 150 kW)DOCX, 18.28 Kb
-
Algorithm of investor’s actions on procedures of connection to power grids (medium and large business – over 150 kW)DOCX, 19.48 Kb
-
Algorithm of investor’s actions on procedures of connection to water supply and wastewater disposal facilitiesDOCX, 18.43 Kb
-
Algorithm of investor’s actions for obtaining a construction permitDOCX, 49.93 Kb
-
Algorithm of investor’s actions on procedures of registration of title to the commissioned facilityDOCX, 18.58 Kb
-
Algorithm of investor’s actions for obtaining a permit for commissioning of the facilityDOCX, 18.05 Kb
-
Algorithm of investor’s actions for obtaining a land plot for lease (without bidding)DOCX, 16.74 Kb
-
Algorithm of investor’s actions for obtaining a land plot (through a bidding process)DOCX, 16.49 Kb
-
Algorithm of investor’s actions on the procedure of connection to heat supply networksDOCX, 26.56 Kb
-
Algorithm of investor’s actions to provide access to road infrastructure through construction or reconstruction of intersections and (or) adjacencies to highwaysDOCX, 22.60 Kb
-
Algorithm of investor's actions on connection (process connection) of gas-using equipment and capital construction facilities to gas distribution networksDOCX, 23.99 Kb